The company
We make the material and we run the work
IEBCO works in hydrocarbon remediation and petroleum waste management. What separates it from a purely service contractor is that the biological material used on a project is the company’s own product — and the same team designs, executes and monitors the operation on the client’s site.
How the company is built
Two tracks, joined
The company runs on two parallel tracks: developing and producing biological material, and executing remediation work in the field. Either stands on its own, but the value is in the join — the material used on a job belongs to the same team that designs and runs the job.
-
Field execution
Characterising the contamination, lifting and handling the waste, treating it biologically in place, tracking how contamination falls, and restoring the land when the work is done.
- Site assessment and sampling before any method is fixed
- Treatment inside the project site, with no off-site transfer of waste
- Monitoring through sampling and analysis as the work proceeds
- Land restoration and revegetation as the closing stage
-
Material development and production
Developing hydrocarbon-degrading microbial strains and formulations, and taking them from laboratory scale through industrial production into field use.
- Development of a hydrocarbon-degrading microbial product
- Production at industrial scale for project consumption
- Supply of material to remediation operations, inside and outside Iran
- Carrying laboratory results into real site conditions
Executed record
The records cleared for publication
This list carries only the records the company has cleared for public release. For each one, the period, the contracting party and IEBCO’s contractual role are printed exactly as the source records them.
-
1391
Jalali
Field project Case studyOil-based drilling mud plant — waste remediation
Recovery of oil from the waste, biological treatment of the contaminated water and the solid waste, and — as the closing stage — restoration and revegetation of the works area.
- Contracting party
- National Iranian South Oil Company
- IEBCO’s role
- Executed jointly by Industrial and Environmental Biotechnology Company and ACECR Applied Sciences Research Institute
-
1394
Jalali
Technology developmentتجاریسازی و تولید صنعتی پودر میکروبی تجزیهکننده آلودگی نفتی
Taking the hydrocarbon-degrading biological material to industrial-scale production for use in remediation work.
- Contracting party
- Iranian Oil Terminals Company
-
2019
Gregorian
Field project Case studyDrilling waste bioremediation — Samawah, Iraq
Supply of the bioremediation agent, technical consulting and monitoring of the biological treatment of hydrocarbon-contaminated soil and sludge in Block 12.
- Contracting party
- Zhongman Petroleum and Natural Gas Group Co., Ltd (Iraqi Branch)
- IEBCO’s role
- Sub-contractor
-
21/11/1399 – 1402
Jalali
Field projectProvision of waste management services
Provision of waste management services under the contract recorded in the source.
- Contracting party
- DCI
Technical backing
The laboratory work is attached to the operation
Decisions on a remediation job are made on measurements rather than assumptions. The company keeps its own portable laboratory to support part of the assessment and monitoring close to where the work is happening.
- Contamination characterised before the method is fixed
- Progress tracked during execution, near the site
- A clear line between the company’s own facilities and third-party analytical methods
Company details
Company details
The details below are those the company has approved for publication.
- Company name
- Industrial and Environmental Biotechnology Company
- Persian name
- شرکت زیست فنآوران صنعت و محیط
- Short name
- IEBCO
- CEO
- Dr. Ali Abolhasani Soorki
- Based in
- Tehran, Iran
Start a conversation
If you have a problem on site, put it to us
The type of contamination, the approximate volume of waste, and initial TPH data where you have it are enough for a first assessment.